Page 1 of 1

Work Day April 27

PostPosted: Sat Apr 27, 2013 8:01 pm
by MacMike
April 27 – Work Day! Pretty much everyone was at the field 30 minutes early at 8:30! :D

Great showing of guys! But of course we missed a lot of you as well.

We sanding the tables and benches that we did not replace and fixed some of the boards.
Removed all of the t-tables and used some of the boards from them to fix the tables that needed it.
Pulled up the old mats that were for the GS Planes
Took everything out of the club house shop vac’d the inside and pulled up the carpet that will be replaced with vinyl
Spread of the gravel and leveled it
Rearranged the tables per Brad’s blue prints that were approved at last meeting.
Mowed the lawn and east infield
Replaced the Carl Henson Field sign posts
Made a new 12 foot table that will be used for food and prizes at events and can be used as an all purposed table during the week
Pressure Washed the following:
Port a Potty
Club House
Some of the tables
BBQ (gross it needed it bad!)
Coolers
Removed the aluminum gear holders from the benches

All in all it was a great day that started off with donuts, thanks to our President with Burgers and Hot Dogs that soon followed cooked from your favorite chef and mine Al! All of the club members should be proud of the great groups of guys that we have as am I. Great job guys you always step up to make you club awesome. Thanks everyone.

:handgestures-thumbupleft:

See here for pictures
http://eugenerc.org/wp/Field%20Pictures/
&
http://eugenerc.org/wp/photos-2013/

Re: Work Day April 27

PostPosted: Sun Apr 28, 2013 2:14 pm
by GOGO29
It looks gerat out there. The back of my neck and arms got fried, soon it will turn into a nice farmers tan :lol: suppose im ready for spending the summer at our fresh clean field now :D